"Down the Road..."

Wisconsin Street and 35th Street Complete Reconstruction:

The City will be contracting work to be done over the next 2 years completely reconstructing Wisconsin Street from 26th Street west just past PVJH and also 35th Street from Wisconsin Street to Valley Drive.  This major project will include culvert replacement, tearing out and replacing the existing road surface, and work on a sidewalk on the north side of Wisconsin Street.  This will be a major project, with many moving parts - so watch for added information on staging of the project, temporary road closures and detours, construction equipment and barricades.  The City has been and will continue to work with Pleasant Valley Community School District on the logistics of travel throughout this project.    Work will begin Summer, 2021 and continue through late fall, 2021 and will finish up Summer, 2022.  Thank you for your patience through this much needed improvement in our community!

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
Territorial Road Bridge Replacement (2):  
The City will be contracting the work for the total replacement of both the Territorial Road Bridge at 277th Avenue and the Territorial Road Bridge just to the east of 277th Avenue across from the Rock Quarry for 2022.  Watch for more information about detours, timetable, and other construction details in the months ahead.  
  1. 1
  2. 2
  3. 3
  4. 4
Downtown Sidewalk Replacement:

There will be a number of sections of downtown sidewalk and handicap egress areas that will be replaced most likely sometime in 2022.  Watch for details on Iowa DOT timetable, plans, access during construction, etc... as this project develops.
  1. 1
  2. 2
Downtown Highway Repair and Resurfacing:

Highway 67 through Downtown LeClaire will be repaired and resurfaced most likely sometime in 2022.  Watch for additional Iowa DOT plans and construction timetable as this project gets closer. 