Timetable:
Bids out and awarded: Spring, 2023
Project: Summer, 2023
Project Description:
The City will contract out our Concrete Panel Replacement Program again this year. Panels will be cut, dug out, and replaced on a number of streets throughout LeClaire. The following is a list of Streets with 1 or more panels that will be replaced.
Eagle Ridge Road (3 areas)
Stagecoach Trail (2 areas)
Eagle View Court (4 areas)
Falcon Court
Wells Fargo Trail
Scenic Place
Mississippi Terrace
Walbriar Court
8th & Dodge Street (Manhole Boxout)